Chandra, V and Loosemore, M (2011) Communicating about organizational culture in the briefing process: case study of a hospital project. Construction Management and Economics, 29(03), 223–31.

Chowdhury, A N, Chen, P-H and Tiong, R L K (2011) Analysing the structure of public-private partnership projects using network theory. Construction Management and Economics, 29(03), 247–60.

Laryea, S (2011) Quality of tender documents: case studies from the UK. Construction Management and Economics, 29(03), 275–86.

Li, H, Guo, H L, Skitmore, M, Huang, T, Chan, K Y N and Chan, G (2011) Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong. Construction Management and Economics, 29(03), 233–45.

  • Type: Journal Article
  • Keywords: prefabricated construction; IKEA model; virtual prototyping; design optimization; construction optimization
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2010.545994
  • Abstract:
    Prefabricated construction is regarded by many as an effective and efficient approach to improving construction processes and productivity, ensuring construction quality and reducing time and cost in the construction industry. However, many problems occur with this approach in practice, including higher risk levels and cost or time overruns. In order to solve such problems, it is proposed that the IKEA model of the manufacturing industry and VP technology are introduced into a prefabricated construction process. The concept of the IKEA model is identified in detail and VP technology is briefly introduced. In conjunction with VP technology, the applications of the IKEA model are presented in detail, i.e. design optimization, production optimization and installation optimization. Furthermore, through a case study of a prefabricated hotel project in Hong Kong, it is shown that the VP-based IKEA model can improve the efficiency and safety of prefabricated construction as well as reducing cost and time.

Mbachu, J and Frei, M (2011) Diagnosing the strategic health of an organization from SWOT analysis results: case study of the Australasian cost management profession. Construction Management and Economics, 29(03), 287–303.

Shan, Y, Goodrum, P M, Zhai, D, Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(03), 305–16.

Tabish, S Z S and Jha, K N (2011) Analyses and evaluation of irregularities in public procurement in India. Construction Management and Economics, 29(03), 261–74.